How Much Does It Cost to Remodel a Kitchen?
A kitchen remodel typically costs $31,000–$42,500 for an average 150-square-foot kitchen with semi-custom plywood cabinets, quartz counters, and mid-range finishes, at 2026 national-average prices. A budget refresh with stock cabinets and laminate counters runs $19,500–$26,500, while a high-end custom remodel with bespoke cabinetry and commercial-grade appliances reaches $50,000–$68,500. These ranges include labor, plumbing and electrical work, permits, disposal, sales tax, and a 10% contingency — the full installed cost, not just materials.
This guide breaks down what a kitchen remodel costs by size and finish level, what the price actually includes, the decisions that move it most, and the items quotes most often leave out. It is written for a homeowner planning a remodel or comparing contractor bids, before anyone signs anything. For a number based on your own kitchen size and city, use the kitchen remodel calculator. If you're holding a quote, paste it into the Quote Checker to see what is missing.
Cost at a glance
Kitchen size sets the baseline; finish level sets where in the band you land. Use the square footage calculator to measure your kitchen before you start budgeting.
| Kitchen size | Typical footprint | Installed cost range |
|---|---|---|
| Small / galley | About 80 sq ft (8' × 10') | $17,000–$23,500 |
| Average | About 150 sq ft (10' × 15') | $31,000–$42,500 |
| Large with island | About 220 sq ft (14' × 16') | $45,000–$61,500 |
| Finish level | What it means | Per sq ft | 150 sq ft kitchen |
|---|---|---|---|
| Budget refresh | Stock RTA cabinets, laminate or entry-level butcher block, basic ceramic tile, existing layout | $130–$175 | $19,500–$26,500 |
| Quality mid-range | Semi-custom plywood cabinets, quartz or granite counters, tile backsplash, stainless sink and fixtures | $205–$285 | $31,000–$42,500 |
| High-end custom | Bespoke custom cabinetry, exotic quartzite or marble, commercial-grade appliances, relocated plumbing and island | $335–$455 | $50,000–$68,500 |
All ranges are national averages from our calculator, including labor, permits, disposal, sales tax, and a 10% contingency. Metro labor rates can move them 10–50% — an average kitchen runs about $42,500–$58,500 in New York and $44,000–$60,500 in the Bay Area. See how we calculate costs.
What's included in the price
A kitchen quote is a bundle of separate trades. The major line items, roughly in order of cost:
- Cabinetry and hardware. The largest share of the job, often 30–40%. The cabinet brand, line, door style, and box construction (solid plywood vs. particleboard) should be in writing.
- Countertops and backsplash. Fabricators charge separately for seams, sink cutouts, and edge profiles — the slab price is only part of the number.
- Kitchen flooring. LVP or tile, with underlayment and leveling; see our flooring guide for per-square-foot detail.
- Plumbing and fixtures. New rough-in, shut-off valves, sink, and faucet; relocation costs far more than replacement in the same spot.
- Electrical and recessed lighting. Dedicated circuits for the microwave, disposal, and dishwasher, plus cans and under-cabinet lighting.
- Appliance fitting and installation. Even when you buy the appliances, hook-up, delivery, and fit-out are usually separate line items.
- Demolition and dumpster haul-away. Tear-out of cabinets, counters, and flooring, plus dumpster rental and disposal responsibility in writing.
- Drywall repair and painting. Walls behind old cabinets almost always need patching and paint before the new ones go in.
What drives the cost up or down
Cabinets first. Stock RTA boxes are the cheapest path; semi-custom plywood cabinets are the mid-range sweet spot; fully custom, made-to-measure cabinetry costs multiples more. Soft-close hardware, full-extension drawers, pull-outs, and solid face frames add up quickly. This is the line where a quote can swing $10,000 either way for the same kitchen.
Layout changes. Keeping the sink, range, and refrigerator where they are avoids new plumbing and gas runs. Moving any of them typically adds $1,500–$5,000 apiece in rough plumbing, gas, and electrical before a single cabinet is hung.
Countertop material. Laminate is the budget path. Quartz and granite sit in the mid band. Quartzite and marble land in the premium band — and fabricators charge for seams, sink cutouts, and edge profiles on top of the slab price.
Appliances. Standard stainless appliance packages are baked into the mid-range price. Commercial-grade ranges, built-in refrigeration, and panel-ready dishwashers push a remodel into the high-end band fast.
Electrical scope. Dedicated 20-amp appliance circuits, under-cabinet lighting transformers, and recessed cans are frequently billed separately if the quote only says "reuse existing outlets." The often-missed transformer and low-voltage lighting package alone runs $800–$1,800.
What quotes often leave out
If a bid comes in thousands below the others, check it against this list before celebrating:
- Subfloor rot or leveling under old cabinets. Tear-out reveals what the old cabinets were hiding. Written unit pricing for subfloor repair — typically $600–$1,500 — should be in the contract up front.
- Under-cabinet and in-cabinet lighting transformers. The fixtures get quoted; the transformers, dimmers, and low-voltage runs that power them don't. Typical cost: $800–$1,800.
- HVAC toe-kick duct relocations. Moving a register that ends up under new cabinetry runs $400–$900 and is almost never in the base bid.
- Plumbing and electrical trade permits. City building and trade permit fees should be itemized, not waved away with "we'll handle it."
- Cabinet warranty terms. A warranty period on cabinet installation and plumbing connections should be stated in months or years.
- Dumpster and jobsite cleanup responsibility. Who rents the dumpster, who pays the overage, and what "broom clean" means at the end of each day.
Paste the bid into the Quote Checker — it flags the missing scope that turns a cheap bid into an expensive remodel.
How to save without cheaping out
- Keep the layout. Every appliance and fixture that stays where it is saves roughly $1,500–$5,000 in plumbing, gas, and electrical work.
- Refinish before replacing. If the cabinet boxes are solid, refacing (new doors and drawer fronts) or a professional paint job delivers most of the visual upgrade at a fraction of replacement cost.
- Choose your countertop battles. Quartz for the perimeter counters and butcher block for the island looks intentional and costs less than stone everywhere.
- Reuse what the new kitchen doesn't see. Sound plumbing supply lines and decent wiring can stay; spend the money where you'll touch and see it daily.
- Order materials before demolition. Lead times on semi-custom cabinets are the number-one schedule killer. A delayed cabinet delivery can leave you without a kitchen for weeks longer than planned.
What not to skimp on: plywood box construction, the countertop cutouts and seams (done once, seen forever), and dedicated electrical circuits. These are the items you can't easily redo after the fact.
Permits and timeline
A permit is usually required when a kitchen remodel touches plumbing, electrical, or structural elements — which means most remodels beyond a cosmetic refresh. Budget a few days to a couple of weeks for approval depending on your city, and don't skip it: unpermitted work can stall a home sale and complicate insurance claims. In homes built before 1978, EPA lead-safe rules apply to contractors disturbing painted surfaces.
Expect 4–6 weeks for a budget refresh and 8–12 weeks for a mid-range remodel, not counting design and cabinet lead time. Live without a full kitchen for the whole duration — set up a temporary cooking station before demolition day, because the "two weeks without a stove" plan always lasts longer than you think.
The planning matters more than the picking. Get an itemized scope from every bidder that names the cabinet brand and box construction, the countertop slab and edge profile, the permits, the disposal, and the electrical circuits — then compare line by line. That's how you pay the real price of a kitchen remodel, not the surprise one.