How Much Does a Bathroom Remodel Cost?

Modern remodeled bathroom with tiled walk-in shower, double vanity, and large mirror

Frequently asked questions

How long does a bathroom remodel take?
A full hall-bath remodel typically takes 2–4 weeks of active construction; a primary suite with custom tile work can run longer. Custom vanities and back-ordered tile are the two most common delays, so order materials before demolition starts.
Do I need a permit to remodel a bathroom?
Usually yes, when the work touches plumbing or electrical, which most full remodels do. Permit timelines run from a few days to a couple of weeks depending on your city — and unpermitted work can stall a future home sale.
What is the cheapest way to remodel a bathroom?
Keep the layout — every fixture that stays put saves roughly $1,000–$3,000 in plumbing work. A cosmetic refresh with a prefab shower stall, prefab vanity, and vinyl flooring typically runs $8,600–$12,000 installed.
Can I move my toilet or shower to a new spot?
Yes, but moving a drain line or vent stack means opening walls and floors, and each relocated fixture typically adds $1,000–$3,000. Get the new layout priced in writing before demolition begins.
Does a bathroom remodel add home value?
A tasteful mid-range remodel can make a home noticeably easier to sell and often recoups a good share of its cost, but it is not a guaranteed return on paper. Spend for how you'll use the bathroom, not as a pure investment.

Ready to run your own numbers?

Use the matching calculator for an itemized planning range, then audit any quote before you sign.

Open calculator →Check a quote →